Search
Close this search box.
Logo Senercom Update2024 Oficial02
enap
Centrales de Flujo en Tierra del Fuego
Edificio Pivcevic
100 kW of installed power, Private residential building.
Antarctica 21
120 kW of installed and distributed power, assembly, and distribution of electronic communication equipment.
Hotel Cabo de Hornos
180 kW of installed and distributed power, assembly, and distribution of electronic communication equipment.
Gimnasio Poliderportivo 18 de Septiembre
100 kW of installed and distributed power.
Municipalidad Punta Arenas
Installation and configuration of 13 points for Closed-Circuit Television (CCTV) equipment.
Local Comercial Recasur
Distribution of electrical power, connectivity points, control, and power.
Cuartel SEEI
Distribution of electrical power, connectivity points, control, and power. Isla Rey Jorge, Chilean Antarctica.
Estacion de Servicio y strip Center
Distribution of electrical power, Renewable Energy, connectivity points, control, and power.
Barrio Tierra Patagonia
350 kW of installed and distributed power.
en_USEnglish